+234 809 954 2111
info@fairtexgroups.com
Fairtex Group provide Pipe Freezing services for placing a temporary pressure barrier (ice) for carrying out termination, modification and repair on pipelines, well casing, tubing, drill pipe, spool, valve, or other pressure-containing components without having to drain out the entire pipe content, when the use of conventional barrier options is not possible. Our expert team focuses on the most important steps before any freeze operation, by ensuring that surface components can safely withstand the cryogenic temperatures that will occur during the expected duration of the freeze operation
Pipe material: Suitable for carbon steel, galvanised steel, stainless steel, ductile and cast iron
Pipe diameter: Up to 48"
Pipe medium: Suitable for various water based medium
Maximum operating pressure: 5,000 psi
Maximum operating temperature: ±80°C